LEO BESS 12
100 kWPrice on request
Commercial energy storage
An air-cooled commercial storage system with batteries, power conversion and control. The operating strategy is selected from the site’s electricity demand profile.
Orders take up to 4 months. Call to check stock in Lithuania.
BENY · Manufacturer
We review your grid connection, available power and operating needs. Your proposal sets out the equipment, configuration and installation scope.
Our team provides service and warranty support in Lithuania. Warranty duration is listed for the selected configuration.